HI, I am glad to know finally we are going to have new paint. I am just concern over the security during the period of the painting job, when the rack is put in place, it is very easy for anyone to climb up to the balcony. Is there any additional security to monitor and prevent it from happening?
Actually I am curious how will the progress of the pain take place, ie will they put up rack everywhere then start to pain or will they put up rack in a session and pain, then move on to the other.
Yes security, security, safety safety indeed very important and being discuss in the MC for almost one month,between the
paint manufacturer and the residents at the EGM.Staffs will be register,rest area located,public liability insurance,increase
extra guard from three to four two months ago and many other.Work schedule will be on the notice board soon by Peter.
Work start at the lowrise in stage before moving to the highrise in stage or both together. Hopefully the residents
can liaise with Peter since the painting include the balcony and washing areas. WCBfan you can give inputs to Bryan Lian from
Orica Testure Coatings manager at 012-2009842 so that we can have a better security control.
WCBfan our actual worry will be the main pressure water pipe and the lift, with four circuit board per lift, old cables to be replace
at almost 500meters per lift, shaft and pulley worn out and motor,braking shoe and sensors. WCB still need personnel with good
technical background so that no trial and error being tested on us by the contractors.Pls call Peter for more detail, may
be he can go into more details.WCBfan and Bong, Peter is quite helpful.